Services

KPC Biofilter Wastewater Treatment System Maintenance Contract
  1. The concrete vessel and all that is contained including inspection of all internal plumbing, electrical components and biomedia. Sludge levels are checked together with correct function of the air pump and sludge return.
  2. The in-house electrical control unit is checked for correct functioning.
  3. The exterior of the concrete vessel, surrounding area and percolation bed are checked for adverse signs of ponding.
The maintenance contract is for annual inspection only. A report will be forwarded to the householder. The cost of this maintenance is €150 + vat.

- Click Here for Maintenance Contract Applications Form
- Biofilter Wastewater Treatment System User Manual

Certified By

Certificate No.05/0216 Click here to download Certificate
 
 Products
   - Auckland Rainwater Harvesting
   - Sewage/Wastewater Treatment System
   - Septic Tanks
   - Large Holding Tanks
   - Window Sills
   - Other Pre-Cast Products
   - Trowel Ready Mortar
rainharvest system Sewage Treatment System Wastewater treatment